News
Proyek Sedang dikerjakan
NAMA PROYEK | SCOPE | LOKASI | PEMILIK | MULAI | SELESAI |
PENONAKTIFAN JARINGAN GAS BUMI AKIBAT PEMBANGUNAN JALUR DOUBLE TRACK PT.KAI | EPC | SIDOARJO | PT.PGN | 2020 | - |
KEHANDALAN JARINGAN GAS BUMI BYPASS KRIAN DAN TROSOBO | EPC | SIDOARJO | PT.PGN | 2019 | - |
PEMBANGUNAN PIPA GAS 24 INCHI WILAYAH GRESIK (GLT) | CONSTRUCTION | GRESIK | PT.PGN | 2019 | 2020 |
PENGEMBANGAN INFRASTRUKTUR PURWAKARTA-SUBANG SECTION 1A | CONSTRUCTION | SUBANG | PT.PGN | 2019 | 2019 |
PEKERJAAN JARINGAN GAS,REJECT WATER &WASTE WATER | EPC | GRESIK | PT.BKMS | 2018 | 2018 |
PEKERJAAN PIPA BEBAN PDAM TAHAP III | CONSTRUCTION | SURABAYA | PT.PDAM SURYA | 2018 | 2018 |
HOT TAPPING & TURBIN METER SKID G250 | EPC | SIDOARJO | PT.BAGS | 2018 | 2019 |
RELOKASI PIPA AIR 10" DIAREA PT.BARATA | EPC | GRESIK | PT.PKG | 2018 | 2018 |